RENDER2
3
CABS2
Capture
ELECTRICAL PLAN
Electrical
BASIC KITCHEN LAYOUT
Capture5
Capture3
Capture4
Capture2
Capture6
IMG_2834
IMG_2835
IMG_2836
IMG_2837
CIRCA 1972
IMG_6990
Demo Day 7/27/2022
IMG_6992
Exploratory surgery on the firdowns
IMG_6993
The firdowns were the hardest thing to extract
IMG_6994
Tiny bit of old mold- the sink was detached from the countertop and leaked here.
IMG_6995
Very clean, no evidence of water leaks from the half bath
IMG_6996
Dividing wall removed
IMG_6997
Free floating wall was not load bearing
IMG_6998
That was a LOT of work!
IMG_6999
All gone- bye firdowns! You gave me bad dreams.
IMG_7001
End of day vid
IMG_7002
Recent brass supply valve installation?
IMG_7004
Plumbing valves and drain assembly in perfect condition
IMG_7005
ROUGH OPENING
The opening has to be slightly smaller, 8" max due to load bearing limits.
Lets a lot of light from the front through to the living room
IMG_7012
Ready for electrical and gas line installation
IMG_7013
New insulation for this wall. The exterior rock board is in great shape, no mold discovered.
IMG_7014
Existing galvanized water pipes show no rusty or corroded pipe joints
IMG_7015
3 seperate lines incoming: 2-14GA 15A and one 12GA 20A
Rough opening
IMG_7016
Super clean- no evidence of insects or mold/mildew throughout
IMG_7017
Gas line will be relocated to right side wall
IMG_7019
End of second day vid
IMG_7021
IMG_7024
Kind of sweaty under the plastic.
IMG_7026
IMG_7027
IMG_7028
IMG_7029
IMG_7030
IMG_7032
IMG_7033
IMG_7034
IMG_7035
IMG_7036